Core Service · Build

Airport and Mall Kiosk Vendor in India

We manufacture the kiosk and prepare the compliance paperwork together, proven across Uber's airport kiosk program in Mumbai, Pune and Kolkata.

Airport and Mall Kiosk Vendor in India
In one line

Design, manufacture and install under one roof

No handoffs between a designer and a contractor. One accountable team from the first drawing to handover.

🧩

One team, one contract

Design, fabrication and installation in-house, so nothing falls through the gaps.

📋

A clear BOQ first

Every line priced before we cut anything. The number you see is the number you pay.

Built to airport standards

Compliance and finish held to the bar we meet on the Uber airport programme.

Overview

What this service includes

Getting a kiosk into an airport or a large mall is a compliance problem before it is a manufacturing one. Fire safety clearance, structural documentation, electrical certification, brand sign-off and vendor onboarding all come first, and an authority handling footfall in the hundreds of thousands a day will not wave a kiosk through without them. Kaizeng manufactures the kiosk and prepares the documentation package that gets it approved, from our own unit in Naigaon, Mumbai. We have already cleared this process for Uber across airports in Mumbai, Pune and Kolkata.

What compliance does Kaizeng handle?

We prepare the approval package alongside the build, not as a scramble after manufacturing is done.

RequirementWhat we prepare
Structural and electricalDocumentation in the format your venue's technical team expects
Fire and material safetyFire-rated materials and compliance paperwork for airport and mall standards
Brand sign-offDesign coordinated to clear both the venue review and your brand standards in one pass
Vendor onboardingOnboarding paperwork and insurance documentation, prepared with the build

Why is airport and mall work a separate lane?

A finished kiosk design can sit unbuilt for weeks because a fire NOC has not cleared or the structural drawings were not in the format the authority wanted. We have sat on the other side of that process enough times to know what each authority actually asks for, and we prepare for it before the design is frozen. The manufacturing timeline of 8 to 25 days then runs in parallel with approval, so documentation is not the bottleneck.

Frequently asked questions

Do you handle vendor approval paperwork, or just the kiosk?

Both. We prepare structural, electrical, fire safety and brand documentation alongside manufacturing, so the approval package and the kiosk move together.

Which airports and malls have you worked with?

We built and installed Uber's kiosk and pickup-zone units across airport terminals in Mumbai, Pune and Kolkata, three separate authorities each with their own requirements.

Can you help if we already have vendor approval?

Yes. If your approval is in place, we manufacture and install against your existing documentation requirements and delivery date.

How long does approval take?

That varies by venue and authority, and it is the one part we do not fully control. What we control is not being the bottleneck: our documentation is usually ready before a venue's review board meets.

Where do you manufacture?

In our own unit in Naigaon, Mumbai, with a Jaipur partner line for high volume. The team that prepares your compliance package is the team that builds the kiosk.

Need airport or mall vendor approval and a kiosk? Discuss Your Project with our team, or message us on WhatsApp.

Pick your space

What we build

Airport and Mall Kiosk Vendor in India
Where we work

Delivered across your region

Mumbai, Pune, Kolkata and malls and airports pan-India

Proof, not renders

We have done it under pressure

4 airports

Built Uber's kiosk and pickup-zone units across Mumbai, Pune, Kolkata and Navi Mumbai, under airport-grade compliance and fixed deadlines.

18 days

Penguin Bean Coffee in Bandra, from a bare shell with no power or water to a fully operational cafe.

No mystery

How it works

1

Brief and site visit

We read the space as it actually is, not as the drawings assume.

2

Locked BOQ

Scope frozen, every line priced. You approve before we start.

3

Build and install

Fabricated in our Powai unit, installed on site inside tight windows.

4

Handover

Snagged, compliant and documented. Open the doors.

Need airport or mall vendor approval and a kiosk? Talk to us this week.

Tell us the site, the format and the date. We come back with a locked BOQ and a handover date you can hold us to.

Planning a space? Get a free estimate.
One accountable team, built in-house in Powai, Mumbai.